[root@cpmlx-edgv2-01 patch_12.1.2.1.2.150617.1]# ./patchmgr -ibswitches /u01/patch/ibs_group -upgrade -ibswitch_precheck ******************************************************************************** NOTE Cells will reboot during the patch or rollback process. NOTE For non-rolling patch or rollback, ensure all ASM instances using NOTE the cells are shut down for the duration of the patch or rollback. NOTE For rolling patch or rollback, ensure all ASM instances using NOTE the cells are up for the duration of the patch or rollback. WARNING Do not start more than one instance of patchmgr. WARNING Do not interrupt the patchmgr session. WARNING Do not alter state of ASM instances during patch or rollback. WARNING Do not resize the screen. It may disturb the screen layout. WARNING Do not reboot cells or alter cell services during patch or rollback. WARNING Do not open log files in editor in write mode or try to alter them. NOTE All time estimates are approximate. NOTE You may interrupt this patchmgr run in next 60 seconds with CONTROL-c. ******************************************************************************** 2015-07-01 22:52:35 -0300 1 of 1 :SUCCESS: DO: Initiate pre-upgrade validation check on InfiniBand switch(es). ----- InfiniBand switch update process started Wed Jul 1 22:52:35 BRT 2015 ----- [NOTE ] Log file at /var/log/cellos/upgradeIBSwitch.log [INFO ] List of InfiniBand switches for upgrade: ( cswlx-eibav2-01 cswlx-eibbv2-01 ) [PROMPT ] Use the default password for all switches? (y/n) [n]: y [PROMPT ] Checking only 2 switch(es). Are you sure you want to continue? (y/n) [n]: y [SUCCESS ] Verifying Network connectivity to cswlx-eibav2-01 [SUCCESS ] Verifying Network connectivity to cswlx-eibbv2-01 [SUCCESS ] Validating verify-topology output [INFO ] Master Subnet Manager is set to "cswlx-eibav2-01" in all Switches [INFO ] ---------- Starting with IBSwitch cswlx-eibav2-01 [SUCCESS ] cswlx-eibav2-01 is at 2.1.3-4. Meets minimal patching level 2.1.3-4 [SUCCESS ] Verifying that /tmp has 120M in cswlx-eibav2-01, found 249M [SUCCESS ] Verifying that / has 80M in cswlx-eibav2-01, found 201M [SUCCESS ] Verifying that cswlx-eibav2-01 has 120M free memory, found 410M [SUCCESS ] Verifying host details in /etc/hosts and /etc/sysconfig/network-scripts/ifcfg-eth[0,1] for cswlx-eibav2-01 [SUCCESS ] Verifying that cswlx-eibav2-01 has at least 1 NTP Server, found 1 [INFO ] Manually validate the following entries Date:(YYYY-MM-DD) 2015-07-02 Time:(HH:MM:SS) 06:59:47 [SUCCESS ] Execute plugin check for Patch Check Prereq on cswlx-eibav2-01 [SUCCESS ] Pre-update validation on cswlx-eibav2-01 [INFO ] ---------- Starting with InfiniBand Switch cswlx-eibbv2-01 [SUCCESS ] cswlx-eibbv2-01 is at 2.1.3-4. Meets minimal patching level 2.1.3-4 [SUCCESS ] Verifying that /tmp has 120M in cswlx-eibbv2-01, found 249M [SUCCESS ] Verifying that / has 80M in cswlx-eibbv2-01, found 202M [SUCCESS ] Verifying that cswlx-eibbv2-01 has 120M free memory, found 417M [SUCCESS ] Verifying host details in /etc/hosts and /etc/sysconfig/network-scripts/ifcfg-eth[0,1] for cswlx-eibbv2-01 [SUCCESS ] Verifying that cswlx-eibbv2-01 has at least 1 NTP Server, found 1 [INFO ] Manually validate the following entries Date:(YYYY-MM-DD) 2015-07-02 Time:(HH:MM:SS) 07:12:17 [SUCCESS ] Execute plugin check for Patch Check Prereq on cswlx-eibbv2-01 [SUCCESS ] Pre-update validation on cswlx-eibbv2-01 [SUCCESS ] Overall status ----- InfiniBand switch update process ended Wed Jul 1 22:53:54 BRT 2015 ----- 2015-07-01 22:53:54 -0300 1 of 1 :SUCCESS: DONE: Initiate pre-upgrade validation check on InfiniBand switch(es). [root@cpmlx-edgv2-01 patch_12.1.2.1.2.150617.1]#